The combination of stylish appearance of stations and vandal-resistant design allows the installation of equipment on both the city's central streets and on the highways
Ultrafast charging station 150-240 kW
Ultrafast charging station 80-240 kW
What You Get —
80% of production localized
List of production equipment and technological process description
Enclosure and mounting panel drawings, assembly diagrams and connection diagrams
List of raw materials and components required (with list of suppliers)
Operating passports and manuals, regulations for testing, installation, commissioning and service support
Basic package with marketing materials
Test bench and test implementation documentation
Software source code for remote control of charging stations (OCPP 1.6)
Staffing table with list of required competencies and employee training
Documentation for production, testing and configuration of all electronic components, including controllers (Chademo, CCS, GBT)
List of production equipment and technological process description
Enclosure and mounting panel drawings, assembly diagrams and connection diagrams
List of raw materials and components required (with list of suppliers)
Operating passports and manuals, regulations for testing, installation, commissioning and service support
Basic package with marketing materials
Test bench and test implementation documentation
Software source code for remote control of charging stations (OCPP 1.6)
Staffing table with list of required competencies and employee training
Documentation for production, testing and configuration of all electronic components, including controllers (Chademo, CCS, GBT)
And comprehensive production commissioning support within 12 months
And comprehensive production commissioning support within 12 months
Contacts
We offer you to quickly and efficiently implement technology or production of electric charging stations!